The Maryland Department of Natural Resources (DNR) will be making modifications to the boat launching pier in the Lapidum Area of Susquehanna State Park. The project will begin March 14 and should be completed in less than three work days, weather permitting.
Due to fabrication of the new floating pier, work cannot begin any sooner. One launch ramp will remain open during construction in order to minimize the interruption of public access. There may be brief periods during which both ramps will be closed due to safety concerns, however, every effort will be made to minimize any interruption if it is safe to do so.
The existing aluminum gangway will be removed and utilized at another DNR facility in the future. The gangway will be replaced with four sections of floating pier that will join the existing concrete floating pier. The floating pier sections will improve the use of the facility at both high and low tide. The modifications of the launching facility will ensure safe, user friendly access to the Susquehanna River for boaters.
For further information, including details on construction dates, please contact park headquarters at (410) 557-7994.
source: MD DNR
Leave a Reply
You must be logged in to post a comment.